Case Study: Confectioner – Sheffield

Confectioner Sheffield

Economisers externally mounted in the boiler exhaust flue for vertically upward gas flow.

The units have manual internal bypass dampers to assist in start-up.

Case Study 1
Capital Cost £35 K
Saving 230 KW
Payback 20 Month
Similar posts
  • Case Study: CHP Plant – Radclif... ThermTech case study. CHP Plant design and installation. With a capital cost of £400k and a 20 months pay [...]
  • Case Study: BNFL Springfields An economiser fitted into the exhaust of a Waste Heat Boiler on a gas turbine power [...]
  • Case Study: Economiser – Aylesb... Installed externally at high level into the flues of two gas fired boilers, these units each gave a 5.2% reduction in gas usage. In addition, when operating only one boiler, the economiser gave an extra 5% increase on the MCR thereby giving extra time before having to bring in an additional boiler. This installation won [...]
  • Case Study: Economiser – Liverp... ThermTech were asked to design, manufacture, and supply & install two replacement economisers for the hospitals waste heat steel boiler. The economisers will together exchange 449 kw of heat ant thereby heat 4,600 KGH of DFW from 85°C to 168°C. Based on performance of other similar economisers that we have installed over the years the [...]
  • Case Study: Economiser – Heinek... Brewery – Heineken- Manchester Heineken has five production locations in Britain with its Manchester Brewery being one of its key facilities. We were asked by Heineken to design, manufacture and install an economiser for the Royal Brewery in Manchester as part of an overall project to reduce energy consumption and cost. The unit cools gases [...]
Translate »