+44 (0)161 339 3049

The waste heat recovery specialists

Case Study: Confectioner – Sheffield

ThermTech designed and manufactured an economiser for Confectioner Sheffield saving them 230 KW with a 20 months payback.

Case Study: CHP Plant – Radcliffe

ThermTech case study. CHP Plant design and installation. With a capital cost of £400k and a 20 months pay back.

Case Study: BNFL Springfields

An economiser fitted into the exhaust of a Waste Heat Boiler on a gas turbine power generator.

Translate »