An economiser fitted into the exhaust of a Waste Heat Boiler on a gas turbine power generator.

The unit was fitted with an integral flue gas by-pass and preheated boiler feed water in within 10 degrees of saturation temperature at 20 bar.

The by-pass was used to automatically regulate the flow of gases through the economiser and so control the water temperature at all combinations of power/heat.

Case Study 3
Capital Cost £64K
Savings 270KW
Payback 18 Months
Similar posts
  • Case Study: Confectioner – Shef... ThermTech designed and manufactured an economiser for Confectioner Sheffield saving them 230 KW with a 20 months [...]
  • Case Study: CHP Plant – Radclif... ThermTech case study. CHP Plant design and installation. With a capital cost of £400k and a 20 months pay [...]
  • Case Study: Economiser – Aylesb... Installed externally at high level into the flues of two gas fired boilers, these units each gave a 5.2% reduction in gas usage. In addition, when operating only one boiler, the economiser gave an extra 5% increase on the MCR thereby giving extra time before having to bring in an additional boiler. This installation won [...]
  • Case Study: Economiser – Liverp... ThermTech were asked to design, manufacture, and supply & install two replacement economisers for the hospitals waste heat steel boiler. The economisers will together exchange 449 kw of heat ant thereby heat 4,600 KGH of DFW from 85°C to 168°C. Based on performance of other similar economisers that we have installed over the years the [...]
  • Case Study: Economiser – Heinek... Brewery – Heineken- Manchester Heineken has five production locations in Britain with its Manchester Brewery being one of its key facilities. We were asked by Heineken to design, manufacture and install an economiser for the Royal Brewery in Manchester as part of an overall project to reduce energy consumption and cost. The unit cools gases [...]
Translate »